Bid 15: Concrete ord qty
Bid Item Order Quantity Report by Subdivision ‑ Detail
Item
Code
Description
Unit
Bid
Quantity
Description
Order
Quantity
Raw
Cost
Cost per
TKF Unit
Unit
Cost Type
Item Ext.
Cost
Division  3: Concrete
Subdivision  3.10: Ready‑Mix‑General
CY
1,666.00
85.44
83.300
20.00
 3.101300
Material
3000 PSI 5.7sa
19.50
CY
Ready‑Mix‑General =
1,666.00
Subdivision  3.20: Accsessories
ea
29.75
0.25
0.250
119.00
 3.200410
Material
High Chairs‑mat
119.00
Ea
HR
20.000
119.00
 3.200415
Labor
High Chairs‑lab
119.00
Hr
2,380.00
20.00
Accsessories =
2,409.75
Subdivision  3.30: Excavate/Forms
HR
50.000
20.00
 3.300715
Equipment
Exc‑Backhoe ‑ Equip Heavy soil
20.00
CY
1,000.00
50.00
HR
50.000
20.00
 3.300720
Equipment
Exc‑Backhoe ‑ Operator
20.00
CY
1,000.00
50.00
Excavate/Forms =
2,000.00
Subdivision  3.40: Reinforcing
Lb
HR
260.45
0.71
0.470
21.990
367.00
4.00
 3.400200
Material
Labor
5/8dia  #5 bar
367.00
Lb
Reinforcing =
260.45
Subdivision  3.90: Equipment
HR
50.000
6.00
 3.901010
Equipment
Backhoe
6.00
Hr
300.00
50.00
HR
50.000
10.00
 3.901050
Equipment
Truck
10.00
Hr
500.00
50.00
Equipment =
800.00
Division 3: Concrete =
7,136.20
Total of Shown Bid
7,136.20